I have a Dell 2950III in production that is running out of CPU and memory.
Spec: 2 x Dual Core Xeon 3.0, 4Gb ram
I have a spare unit
Spec: 2 x Quad Core Xeon 2.5, 8Gb ram
My question is it safer to move the CPU and memory from the spare unit, or is it safer to move the raid controller and drives?